Tutorial 3: excavation with sheet pile, beam and contact spring elements

This tutorial is taken from [2]. An experiment is done with a sheet pile near an excavation. The following is done:

Figure 13: Excavation with sheet pile
\begin{figure}\centerline{\epsfig{file=tutorial_3/tutorial_3.eps,width=10cm,angle=0}}
\end{figure}

The dimension are given in figure 13. At the left side of the sheet pile you see the five excavations levels. All excavations remain above the phreatic water level, which you can see at $y=2.5$. Especially notice point A at which the sheet pile after the second excavation is supported, and later is moved to the left.



Subsections
TochnogProfessional